Fluke MET/CAL Procedure ============================================================================= INSTRUMENT: Beckman DM5XL: CAL ADJ /5520 INSTRUMENT: Beckman DM10XL: CAL ADJ /5520 INSTRUMENT: Beckman DM15XL: CAL ADJ /5520 DATE: 02-Sep-97 AUTHOR: Fluke Corporation REVISION: $Revision: 1.1 $ ADJUSTMENT THRESHOLD: 70% NUMBER OF TESTS: 1 NUMBER OF LINES: 57 CONFIGURATION: Fluke 5520A ============================================================================= # # Compatibility: # 5500/CAL 5.0 or MET/CAL 5.0 or later. # # Subprocedures: # None # # Required Files: # None # # System Specifications: # TUR calculation is based on specification interval of the accuracy file. # The default 5520A accuracy file contains 90 day specs. # # Fluke makes no warranty, expressed or implied, as to the fitness # or suitability of this procedure in the customer's application. # STEP FSC RANGE NOMINAL TOLERANCE MOD1 MOD2 3 4 CON 1.001 ASK- P F V 1.002 ASK+ K X 1.003 HEAD PRELIMINARY INSTRUCTIONS 1.004 DISP Warm-up time: 30 minutes 1.004 DISP Temperature: 25 +/- 2degC 1.004 DISP Humidity: <70% 1.005 DISP [32] WARNING 1.005 DISP HIGH VOLTAGE is used or exposed during the performance 1.005 DISP of this calibration. DEATH ON CONTACT may result if 1.005 DISP personnel fail to observe safety precautions. 1.006 HEAD DISASSEMBLY INSTRUCTIONS 1.007 DISP 1. Remove the back case screws, and carefully 1.007 DISP [32] pry up the back case. 1.007 DISP 1.007 DISP 2. Set the FUNCTION/RANGE switch to 200mV DC. 1.008 HEAD DC VOLTAGE 1.009 DISP Connect the 5520A to the UUT as follows: 1.009 DISP [32] 5520A NORMAL HI to UUT V/OHM 1.009 DISP [32] 5520A NORMAL LO to UUT COM 1.010 5520 190.0mV S 2W 1.011 DISP ADJUST VR1 until display reads 190.0mV +/- 1digit. 1.012 5520 * S 1.013 DISP Disconnect ALL connections. 1.014 HEAD ASSEMBLY INSTRUCTIONS 1.015 DISP Reassemble the back case with the two screws. 1.016 END